December 30, 2019
项目经理在成为PMO负责人过程中需要作出的改变
Less Tactical As a former US Army soldier, being less tactical was never a goal. The more tactics you had, the better you could execute on the overall military strategy. But becoming the PMO Director is more like becoming a Division Commander. You will be an integral part of the strategic portion of the battle. In order to become a PMO Leader, you need to think and communicate more strategically. You need to get out of the weeds, and out of the project plans, and into the business strategy that all of the projects are supporting. There could be several strategies for which hundreds of projects could be supporting. Yes – supporting. A project is the tactical portion of a strategy. It is the “how” you get things done. As an example, if the strategy is to have a completely safe, supported, and flexible environment for your SAS product, then the first level of HOW might be a program of projects to move your SAS product to a globally supported cloud platform. The second level of HOW would be a series of tactical projects to (1) do a data consolidation and migration, (2) restructure the architecture,
November 23, 2019
挣值管理
挣值管理(Earned Value Management, EVM)是项目管理里面成本管理部分较为重点的知识点,但是也可以用来综合考察项目范围和进度绩效,经常需要做相关计算。本文试图来整理一下关于挣值管理的一些概念和知识点。 一、 基本概念PV,EV,AC和BAC 首先是四个基本概念: 计划价值(Planned Value, PV),截止到某时间点计划要完成工作量的价值,也就是计划要做多少事; 挣值(Earned Value, EV),截止到某时间点实际已经完成工作量
November 23, 2019
NPV和IRR
净现值(Net Present Value, NPV):说的是把未来期望收入的钱换算成现在的钱(跟算利息类似,不过是反向运算,例如明年你会赚110元,假设贴现率是10%,那么换算成现在的钱也就是110/(1+10%)=100元,也就是说你明年赚到的110元就相当于现在100元的购买率,反过来就是你现在100元,利息10%,明年你就变成了110元,往后的年份一样算法),然后累加再减去投资成本得到累计净现值。累计净现值越大越好,
October 30, 2019
16天备考PMI-ACP认证通过无悬念—考试不易,自学定能水到渠成
01清晨的消息 几天前的一个早上,屋外斑鸠的叫声刚开始没多久,我那浅浅的睡眠进程被经典的消息提示音中断,一个朋友发来消息,宣布通过了PMI-ACP认证考试。说起我考ACP认证是将近2年前的事情,记得是当时项目上比较紧张,也许自己确实慵懒而没有写点什么与备考的同行们分享。学而不思则罔,思而不学则殆,想来想去还是现在补上,也希望能通过这种方式,与同行学习交流,于是我就问朋友要了几张截图,看起来他成绩不错