Below you will find pages that utilize the taxonomy term “敏捷可视化”
April 14, 2020
敏捷开发框架Scrum工件-冲刺/迭代燃尽图(上篇)
《系统之美》 前言,在本文中,我们将从以下几点了解有关燃尽图的详细内容(上篇为主题1-3): <div class="wpb_single_image wpb_content_element vc_align_center"> <figure class="wpb_wrapper vc_figure photoswipe-item photoswipe-wrapper"><img class="alignnone size-large wp-image-1004" src="https://www.agilewalker.com/wp-content/uploads/2020/04/Insecption_Burndown-1024x576-1.jpg" alt="" width="760" height="428" srcset="https://www.agilewalker.com/wp-content/uploads/2020/04/Insecption_Burndown-1024x576-1.jpg 1024w, https://www.agilewalker.com/wp-content/uploads/2020/04/Insecption_Burndown-1024x576-1-300x169.jpg 300w, https://www.agilewalker.com/wp-content/uploads/2020/04/Insecption_Burndown-1024x576-1-768x432.jpg 768w, https://www.agilewalker.com/wp-content/uploads/2020/04/Insecption_Burndown-1024x576-1-355x199.jpg 355w" sizes="(max-width: 760px) 100vw, 760px" /></figure> </div> <div class="wpb_text_column wpb_content_element "> <div class="wpb_wrapper"> <p> </p> <p> 如果你查看上面的图片,会注意到团队有产品待办事项,在处理sprint待办事项期间,团队提交几个用户故事,然后团队成员分配了任务,对于每个任务,每个成员消耗的是估计的工作时间。到目前为止,已经为冲刺提交了一些故事,每个故事都有一些任
April 14, 2020
敏捷开发框架Scrum工件-冲刺/迭代燃尽图(下篇)
《系统之美》 前言,在本文中,我们将从以下几点了解有关燃尽图的详细内容(下篇为主题4-6): (延续上篇主题1-3 敏捷开发框架Scrum工件-冲刺/迭代燃尽图(上篇)) <div class="wpb_text_column wpb_content_element "> <div class="wpb_wrapper"> <p> 在这种情景下,团队需要查看当前的燃尽图和实际线。 截至特定日期,它们还有多少富余的工作时间。 可能有3种选项: </p> <ol start="1"> <li> <strong>团队可以直接同意将故事添加到当前的sprint中</strong> </li>
April 12, 2020
「视频」值得收藏,敏捷开发,解读冲刺燃尽图,及早发现问题,及早解决
值得收藏,敏捷开发,解读冲刺燃尽图,及早发现问题,及早解决 [https://player.youku.com/embed/XNDYxMDk2Mjk0OA==] — END 希望能在评论区学习到大家的经验和想法~ 如果对相关内容感兴趣可以关注我的公众号:捷伴行Agile。会有更多更及时的文章和视频。
March 19, 2020
简说敏捷转型可视化和可视化敏捷方法
在服务企业研发团队的过程中,我们发现不少团队碰到了类似的问题: 你经常在思考究竟哪些工作是最重要的?如何避免被无穷无尽的项目与工作淹没? 团队成员声称完成了自己的大部分任务,但团队实际交付的需求却寥寥无几? 由于某些问题导致工序一直处于等待状态,怎么识别和处理这些延迟? 成员之间不知道互相都在干什么?各自鸵鸟式地进行着工作。 — END 希望能在评论区学习到大家的经验和想法~ 如果对相关内容感兴趣可以关注我的公众号: